About
Built to Run When Nobody's Watching.
Disposal wells and reclamation trains do not fail politely at 9am. They plug, cavitate, gas-lock and drift past permit at 3am with nobody in the yard.
Operational Intelligence was written on live equipment to close that gap: a control layer that keeps watching when the last truck leaves, understands what each well can physically take, and has the authority to slow a pump or close a valve before a permit exceedance or an equipment failure becomes real.
It is deliberately unglamorous engineering — deterministic rules, documented thresholds, an audit log of every action, and a PLC that will not let software exceed a mechanical limit.
Scope
Full crude recovery train from truck lane to oil sales, including jetting, decant, mix/heat conditioning and Tricanter separation.
Offload, GunBarrel separation, water leg, injection train and per-well permit safety across three permitted disposal wells.
Shared rules engine, well completion model, pump-curve analytics, operator interface, truck kiosk and audit log.
Single well, full facility, or an existing panel brought under OI control.